Accredited Level 2 Service Provider
The three stages of Level 2 work on a new build or knockdown rebuild, and how to avoid delays at handover.
4.9 on Google
From 74 reviews · Read them →
✓ 24/7 emergency call-outs
✓ Ausgrid & Endeavour Energy networks
✓ Fixed quote before we start
Almost every new home, knockdown rebuild and major renovation needs Level 2 work at three stages. Planning it early avoids delays at handover.
Before demolition, the existing service is disconnected and made safe. For renovations, the service may need to be relocated or temporarily disconnected while work happens near it.
A temporary builders supply on a pole or pillar gives trades power during construction. See temporary builders supply.
Near completion, the permanent service and metering are installed, the network is notified and the home is connected. For duplexes and granny flats, each dwelling may need its own connection and meter. See granny flat and duplex connections.
The customer's electricity retailer arranges the meter through its metering provider. We coordinate the Level 2 side so it's ready.
Yes, and it's simpler. We manage the disconnection, builders supply and permanent connection.
Free Quote
Send us the address and what you need, or a photo of your meter box or notice. We'll call you back with a fixed price. Emergencies: 02 8107 9999, 24/7.